Summer 2005

The
break between the end of the spring semester and the
beginning of the summer term provided the perfect
time for construction crews to work on several
projects around the UWA campus.
The cafeteria
(below) is getting a facelift inside and out.
Improvements to the facade of the building will
architecturally integrate it with Webb, Faust and
Brock Halls.